Home.Products.Projects.Guarantees.Affiliations.Contact.Press.
Tel: 020 8802 2333

Once the masonry has been sawn through, a predetermined length of DPC membrane is carefully inserted into the saw cut with a bed of mortar on its upper surface. The membrane is overlapped with the neighbouring section of DPC membrane to ensure a watertight finish.

Installation of the DPC

Next.
Back.